Sheet 04 — Services
AV engineering · Dubai & the UAE

AV design, programming
& commissioning.

Audio visual installation and engineering for complete projects in Dubai and the UAE. One agreed scope, from drawings and equipment supply to a tested handover.

Concept visualisation of an engineer commissioning a professionally cabled AV-over-IP rack room
Fig. 04 — Rack room commissioning, concept visualisation
01Delivery phasesFour stages

One connected process.

A clear path from your first drawing to a system your team can use.

  1. Stage 01

    Understand

    Your space, your people, your operational requirements.

    DeliverableBrief & site assessment
  2. Stage 02

    Engineer

    A coordinated design with the right systems working together.

    DeliverableSystem design & BOQ
  3. Stage 03

    Integrate

    Equipment, programming and installation brought into one plan.

    DeliverableAn integrated AV system
  4. Stage 04

    Handover

    Commissioning, documentation and training for the people using it.

    DeliverableA team ready to operate
02What we deliver06 service lines

Every stage ends in
something you can check.

Each service is defined by its deliverables, so responsibilities stay clear across the project team.

  1. 01

    Design & coordination

    Translate the brief into a coordinated AV scope. Review room layouts, source requirements, interfaces and the responsibilities of each project participant.

    Deliverables
    • System architecture
    • Drawings
    • BOQ
  2. 02

    Equipment supply

    Build the equipment package around the agreed design, with specifications, quantities and interfaces clearly documented.

    Deliverables
    • Equipment schedules
    • Technical submittals
  3. 03

    Integration & installation

    Coordinate equipment placement, signal paths, mounting, power and networking with the wider project team. Site activities and delivery responsibilities are defined in the project scope.

    Deliverables
    • Installation coordination
    • System integration
  4. 04

    Control & programming

    AV programming for room controls, DSP, source routing and operating modes. Define the user interface, audio paths and presets around the agreed scenarios.

    Deliverables
    • Control workflows
    • DSP configuration
    • Room presets
  5. 05

    Commissioning & handover

    Check the assembled system against agreed requirements. Prepare the documentation and training needed to operate it.

    Deliverables
    • Acceptance checks
    • As-built information
    • Training
  6. 06

    Support & maintenance

    Define support coverage, maintenance tasks, response arrangements and escalation paths for the installed system.

    Deliverables
    • Support plan
    • Maintenance scope
    • Service records
03For fit-out and main contractors

An AV subcontractor for your project.

Bring design, equipment, audio visual installation and commissioning into one defined AV package. We coordinate the scope with your site team and the adjacent trades.

01 · Inputs

Send the package you have.

Tender drawings, specifications, a BOQ or an early brief. Include room uses, existing equipment, site access and the intended handover date where known.

02 · Responsibilities

Agree the boundaries.

Define who owns the AV design, mounting structures, power, network, cable routes and finishes. Confirm technical submittals, site sequencing and the acceptance criteria.

03 · Handover

Receive a documented system.

The agreed AV package, installation and programming, commissioning records, as-built information and operator training. Support coverage is defined separately.

04Service map

Where each service sits in the process.

Services overlap where the work does: design and programming continue into integration, support follows the handover.

Delivery stages covered by each service
ServiceUnderstandEngineerIntegrateHandoverAfter handover
Design & coordinationCovers UnderstandCovers EngineerNot coveredNot coveredNot covered
Equipment supplyNot coveredCovers EngineerCovers IntegrateNot coveredNot covered
Integration & installationNot coveredNot coveredCovers IntegrateNot coveredNot covered
Control & programmingNot coveredCovers EngineerCovers IntegrateNot coveredNot covered
Commissioning & handoverNot coveredNot coveredNot coveredCovers HandoverNot covered
Support & maintenanceNot coveredNot coveredNot coveredNot coveredCovers After handover

1 Understand · 2 Engineer · 3 Integrate · 4 Handover · 5 After handover

05Who we work with

Built around your project team.

Fit-out contractors, consultants and the teams who operate the space each need something different from an AV partner.

01
Fit-out contractors

Your AV scope, connected.

BOQ review, design coordination and an integrated AV package that fits the wider project.

Send an AV package or BOQ
02
AV & ICT consultants

Engineering behind the detail.

A technical conversation about requirements, interfaces and how the specified system comes together.

Arrange a technical conversation
03
End users

Designed for everyday use.

Systems shaped around your operations, with commissioning, training and a clear handover.

Describe your space
06Before the project starts

Scope, quotation and acceptance.

What to prepare and what to agree before work begins.

Can you take on the AV package as a subcontractor?

Yes. Send the AV specification, BOQ and available drawings. We agree the design, supply, installation, programming and commissioning responsibilities with the main contractor, including interfaces with IT, electrical works, interiors and mounting structures.

What should we send for an AV quotation?

Start with a brief, room plans or a BOQ. Include the intended uses, source devices, existing equipment, site access and the required handover date where known. We identify missing information and agree the scope before final equipment selection and pricing.

What affects the cost of AV installation and programming?

The number of spaces, signal routes, equipment interfaces, control modes, DSP requirements and site access determine the work. Building and network interfaces, licences, documentation and acceptance tests also need a defined scope. Support and maintenance are agreed separately.

How is AV commissioning accepted?

We agree the operating scenarios and acceptance checks for the project, then verify signal paths, controls and the subsystems working together. Handover includes the agreed test records, as-built information, configuration records and operator training.

07Talk to us

Bring us the brief.

An early concept, a specification or a complete BOQ. We can start with what you have.