Three-building distribution IP-03

Reference design; tests required.

Discuss this option →

Choose a view, then a route, connection or device. Lines retain their original direction. Repeated device IDs refer to the same equipment across views.

IP-03 · Three-building distribution

Typical three-building distribution; R01 spare links are a separate option.

Signal flow

Signal flow. Devices, connections and conditions follow the drawing.Open SVG ↗
IP-03 · Signal flowSolid media paths and dashed logical control paths. Counts are example quantities; all system tests remain to be performed. BASE: one L2 AV VLAN; management VLAN separate Dashed control shares the physical Ethernet links One selected primary video feed per decoder USB, multiview, independent AoIP and streaming excluded Repeated device identifiers refer to the same equipment across views. Equipment illustrations are schematic; labels define quantities.{"sourceHash":"b44ce664d52d6eb7da24be741617bd71475a9fd67b393cbc174190193fb666dc","view":"signal","nodes":["SA","EA","WA","DA","VA","SB","EB","WB","DB","VB","SC","EC","WC","DC","VC","CORE"],"edges":["L01","L02","L03","L04","L07","L08","L09","L10","L13","L14","L15","L16","L19","L20","L21"]}PIXEL COMMAND SOLUTIONS / IP-03 / SIGNAL FLOWSignal flowREFERENCE DESIGN · PROJECT VALIDATION REQUIREDSA → EA: 4 HDMI with audio4 HDMI with audioEA → WA: 4 x 1G + PoE+4 x 1G + PoE+WA → DA: 6 x 1G + PoE+6 x 1G + PoE+DA → VA: 6 HDMI with audio6 HDMI with audioSB → EB: 4 HDMI with audio4 HDMI with audioEB → WB: 4 x 1G + PoE+4 x 1G + PoE+WB → DB: 6 x 1G + PoE+6 x 1G + PoE+DB → VB: 6 HDMI with audio6 HDMI with audioSC → EC: 4 HDMI with audio4 HDMI with audioEC → WC: 4 x 1G + PoE+4 x 1G + PoE+WC → DC: 6 x 1G + PoE+6 x 1G + PoE+DC → VC: 6 HDMI with audio6 HDMI with audioWA ↔ CORE: 10G fibre TX budget 5G / RX 7.5G10G fibreWB ↔ CORE: 10G fibre TX budget 5G / RX 7.5G10G fibreWC ↔ CORE: 10G fibre TX budget 5G / RX 7.5G10G fibre4 HDMI sourcesSA4 HDMI sources4 encoders - fixed TXEA4 encoders - fixed TX1 access switch A 10 endpoint ports PSE at least 375 WWA1 access switch A6 decoders - fixed RXDA6 decoders - fixed RX6 displaysVA6 displays4 HDMI sourcesSB4 HDMI sources4 encoders - fixed TXEB4 encoders - fixed TX1 access switch B 10 endpoint ports PSE at least 375 WWB1 access switch B6 decoders - fixed RXDB6 decoders - fixed RX6 displaysVB6 displays4 HDMI sourcesSC4 HDMI sources4 encoders - fixed TXEC4 encoders - fixed TX1 access switch C 10 endpoint ports PSE at least 375 WWC1 access switch C6 decoders - fixed RXDC6 decoders - fixed RX6 displaysVC6 displays1 shared core 3 base fibre links / 6 SFP+ Single core; no core HACORE1 shared coreVideo / LED dataNetwork / data
Devices, connections & design conditions 15 connections
  • Typical three-building distribution; R01 spare links are a separate option.
  • Three groups of four encoders and six decoders connect through access switches to one core, with a central controller and one client per building.
SA
4 HDMI sources
EA
4 encoders - fixed TX
WA
1 access switch A 10 endpoint ports PSE at least 375 W
DA
6 decoders - fixed RX
VA
6 displays
SB
4 HDMI sources
EB
4 encoders - fixed TX
WB
1 access switch B 10 endpoint ports PSE at least 375 W
DB
6 decoders - fixed RX
VB
6 displays
SC
4 HDMI sources
EC
4 encoders - fixed TX
WC
1 access switch C 10 endpoint ports PSE at least 375 W
DC
6 decoders - fixed RX
VC
6 displays
CORE
1 shared core 3 base fibre links / 6 SFP+ Single core; no core HA
  1. SA → EA4 HDMI with audio
  2. EA → WA4 x 1G + PoE+
  3. WA → DA6 x 1G + PoE+
  4. DA → VA6 HDMI with audio
  5. SB → EB4 HDMI with audio
  6. EB → WB4 x 1G + PoE+
  7. WB → DB6 x 1G + PoE+
  8. DB → VB6 HDMI with audio
  9. SC → EC4 HDMI with audio
  10. EC → WC4 x 1G + PoE+
  11. WC → DC6 x 1G + PoE+
  12. DC → VC6 HDMI with audio
  13. WA ↔ CORE10G fibre TX budget 5G / RX 7.5G
  14. WB ↔ CORE10G fibre TX budget 5G / RX 7.5G
  15. WC ↔ CORE10G fibre TX budget 5G / RX 7.5G

BASE: one L2 AV VLAN; management VLAN separate Dashed control shares the physical Ethernet links One selected primary video feed per decoder USB, multiview, independent AoIP and streaming excluded

Control & status

Signal flow. Devices, connections and conditions follow the drawing.Open SVG ↗
IP-03 · Control & statusSolid media paths and dashed logical control paths. Counts are example quantities; all system tests remain to be performed. BASE: one L2 AV VLAN; management VLAN separate Dashed control shares the physical Ethernet links One selected primary video feed per decoder USB, multiview, independent AoIP and streaming excluded Repeated device identifiers refer to the same equipment across views. Equipment illustrations are schematic; labels define quantities.{"sourceHash":"b44ce664d52d6eb7da24be741617bd71475a9fd67b393cbc174190193fb666dc","view":"control","nodes":["EA","WA","DA","UA","EB","WB","DB","UB","EC","WC","DC","UC","CORE","OPT","CTRL","GW","IT"],"edges":["L05","L06","L11","L12","L17","L18","L22","L23","L24","L25","L26","L27","L28","L29","L30","L31","L32"]}PIXEL COMMAND SOLUTIONS / IP-03 / CONTROL & STATUSControl & statusREFERENCE DESIGN · PROJECT VALIDATION REQUIREDDA → WA: IGMP membership + statusIGMP membership +statusUA → WA: 1G wired access1G wired accessDB → WB: IGMP membership + statusIGMP membership +statusUB → WB: 1G wired access1G wired accessDC → WC: IGMP membership + statusIGMP membership +statusUC → WC: 1G wired access1G wired accessOPT → CORE: uses second uplink on A, B and Cuses second uplink onA, B and CCTRL → CORE: commands via switchcommands via switchCORE → CTRL: endpoint status via switchendpoint status viaswitchGW → CORE: allowed unicast servicesallowed unicastservicesIT ↔ GW: firewall policyfirewall policyWA → DA: route commandsroute commandsEA → WA: source statussource statusWB → DB: route commandsroute commandsEB → WB: source statussource statusWC → DC: route commandsroute commandsEC → WC: source statussource status4 encoders - fixed TXEA4 encoders - fixed TX1 access switch A 10 endpoint ports PSE at least 375 WWA1 access switch A6 decoders - fixed RXDA6 decoders - fixed RX1 wired operator client Local powerUA1 wired operatorclient4 encoders - fixed TXEB4 encoders - fixed TX1 access switch B 10 endpoint ports PSE at least 375 WWB1 access switch B6 decoders - fixed RXDB6 decoders - fixed RX1 wired operator client Local powerUB1 wired operatorclient4 encoders - fixed TXEC4 encoders - fixed TX1 access switch C 10 endpoint ports PSE at least 375 WWC1 access switch C6 decoders - fixed RXDC6 decoders - fixed RX1 wired operator client Local powerUC1 wired operatorclient1 shared core 3 base fibre links / 6 SFP+ Single core; no core HACORE1 shared coreOPTION R01 ONLY +3 separate fibre paths / +6 SFP+ Second path per access to SAME core RSTP: one path blocked; no 20G claimOPTOPTION R01 ONLY1 route controller Local power; programmed UI + driversCTRL1 route controller1 client IT gateway interface AV + management VLAN trunkGW1 client IT gatewayinterfaceClient IT services and administration No media routing to corporate networkITClient IT services andadministrationControl / status
Devices, connections & design conditions 17 connections
  • Typical three-building distribution; R01 spare links are a separate option.
  • Three groups of four encoders and six decoders connect through access switches to one core, with a central controller and one client per building.
EA
4 encoders - fixed TX
WA
1 access switch A 10 endpoint ports PSE at least 375 W
DA
6 decoders - fixed RX
UA
1 wired operator client Local power
EB
4 encoders - fixed TX
WB
1 access switch B 10 endpoint ports PSE at least 375 W
DB
6 decoders - fixed RX
UB
1 wired operator client Local power
EC
4 encoders - fixed TX
WC
1 access switch C 10 endpoint ports PSE at least 375 W
DC
6 decoders - fixed RX
UC
1 wired operator client Local power
CORE
1 shared core 3 base fibre links / 6 SFP+ Single core; no core HA
OPT
OPTION R01 ONLY +3 separate fibre paths / +6 SFP+ Second path per access to SAME core RSTP: one path blocked; no 20G claim
CTRL
1 route controller Local power; programmed UI + drivers
GW
1 client IT gateway interface AV + management VLAN trunk
IT
Client IT services and administration No media routing to corporate network
  1. DA → WAIGMP membership + status
  2. UA → WA1G wired access
  3. DB → WBIGMP membership + status
  4. UB → WB1G wired access
  5. DC → WCIGMP membership + status
  6. UC → WC1G wired access
  7. OPT → COREuses second uplink on A, B and C
  8. CTRL → COREcommands via switch
  9. CORE → CTRLendpoint status via switch
  10. GW → COREallowed unicast services
  11. IT ↔ GWfirewall policy
  12. WA → DAroute commands
  13. EA → WAsource status
  14. WB → DBroute commands
  15. EB → WBsource status
  16. WC → DCroute commands
  17. EC → WCsource status

BASE: one L2 AV VLAN; management VLAN separate Dashed control shares the physical Ethernet links One selected primary video feed per decoder USB, multiview, independent AoIP and streaming excluded

Typical architecture · not a project drawing