| D01 | Zone boundaries | Service areas, sources and staff responsibilities | One controlled mix per independent zone; count simultaneous programmes separately | F&B and operations |
|---|
| D02 | Loudspeaker loading | Transformer taps, cable lengths and losses | Sum the selected taps on each 100 V channel and document the amplifier margin | AV designer and installer |
|---|
| D03 | Sound coverage | Ceiling height, finishes, background noise and event layouts | Predict coverage and measure against agreed project targets | Acoustic designer and operator |
|---|
| D04 | Divisible rooms | Partition positions, simultaneous events and operator rights | Test A, B, separate A/B and combined A+B, including fault recovery | Banquet and engineering teams |
|---|
| D05 | Screens and LED | Actual content, viewing positions, light and service access | Select screen size and pixel mapping for the approved layout | Events team and interior designer |
|---|
| D06 | Guest connections | Source format, connector, level and cable distance | Label each tie-in and test the agreed guest equipment | Event technicians |
|---|
| D07 | Stage sound | Programme, low-frequency demand and neighbouring rooms | Choose PA and level limits from the acoustic brief | Venue operator and acoustic designer |
|---|
| D08 | Lighting | Fixture placement, modes, addresses and cues | Issue a patch and test each scene and loss-of-data behaviour | Lighting operator and fit-out team |
|---|
| D09 | Staff operation | Local volume limits, scene access and device feedback | Separate staff and technical functions; expose unresolved faults | Each operating team |
|---|
| D10 | Building and accessibility interfaces | Programme mute, hearing assistance, environment and access | Agree interfaces and acceptance responsibilities before ordering | Responsible building specialists |
|---|
| D11 | Power and mounting | Every active device, LED and lighting circuit, structural loads | Use nameplate data and approved mounting details; retain maintenance access | Electrical and structural designers |
|---|
| D12 | Hotel constraints | Operator technology standards, existing systems and access windows | Confirm deviations and phased work before installation | Hotel operator and contractor |
|---|